ALSTOM POWER LTD.
2009/2011.
Prefabrication and installation of the mechanical BOP (piping and equipment) for the new RWE Staythorpe “C” Power Station in Staythorpe (UK).
Special industrial demolitions are for sure our pride and satisfaction, representing the special unit of Somi Impianti.
We demolish chimneys of any heights, with the support of our engineering and our technology and safe fly systems.
We build complete power plants such as boilers, gas turbines, steam turbines, generators ” relevant accessories, condensators, balance of plant, piping, electrical filters, denox, desox, steel structures and other parts concerning mechanical works.
2009/2011.
Prefabrication and installation of the mechanical BOP (piping and equipment) for the new RWE Staythorpe “C” Power Station in Staythorpe (UK).
2001/2003.
Mechanical erection of a complete new turbogas power station in Ballylumford (NORTH IRELAND).
Use the following button to contact us directly, our staff will answer your questions as soon as possible