Erections References

 

TIRRENO POWER S.p.A.

2010.
Execution of extraordinary maintenance on the boiler n. 4 (320 MW) of the Vado Ligure Power Station in Vado Ligure (SV – Italy).

 

ALSTOM POWER LTD.

2010 – 2011.
Prefabrication and installation of the mechanical BOP (piping and equipment) for the new RWE Power Station in Pembroke (UK).

 

GEA SCAMBIATORI DI CALORE S.r.l.

2010 – 2011.
Prefabrication and erection of a complete ACC (Air Cooled Condenser) for the “Tamarete Energia” Power Station in Ortona (CH – Italy).

 

IBERDROLA Ingenieria y Construccion

2010 – on going project.
Prefabrication and installation of the mechanical BOP block “I” (piping and equipment) for the new Power Station in Koudiet (Algeria).

 

ALSTOM POWER LTD.

2009/2011.
Prefabrication and installation of the mechanical BOP (piping and equipment) for the new EON Grain Power Station in Grain (UK).

 

ALSTOM POWER LTD.

2009/2011.
Prefabrication and installation of the mechanical BOP (piping and equipment) for the new RWE Staythorpe “C” Power Station in Staythorpe (UK).

 

EDISON S.p.A.

2008/2010.
Prefabrication, erection and supervision for mechanical BOP installation for the revamping of the “Azotati” EDISON Power Station in Porto Marghera (VE – Italy).

 

IBERDROLA

2007 – on going project.
Complete mechanical and E&I erection of n. 2 black start/gas turbine, n. 3 Steam Turbine, generators, condensers, BOP piping and all ancillary systems for the Mesaieed Power Station (Qatar).

 

SIEMENS PLC

2007/2009.
Complete mechanical erection of n. 2 Heat Recovery Steam Generator, equipments, ancillary systems, stacks etc… for the new 800 MW Marchwood Industrial Park Power Station in  Southampton (England).

 

GEA Scambiatori di Calore S.r.l.

2007/2008.
Supply, prefabrication and erection of a complete ACC (Air Cooled Condenser) of no. 35 modules for the EON-SIEMENS Power Station in Livorno Ferraris (VC – Italy).

 

FISIA ITALIMPIANTI S.p.A.

2006/2008 .
Prefabrication and erection of piping, erection of equipments, machinery and ancillary systems for the RAS ABU FONTAS Desalination Plant (QATAR).

 

ANSALDO Caldaie S.p.A.

2006/2007.
Erection of CAGES WALLS for ANSALDO Supercritical boiler 600 MWe  for Section no. 4&2 and erection of Main and Secondary Steel Structures for Section no. 2 ENEL Power Station “Torrevaldaliga Nord” in Civitavecchia (RM – Italy).

 

GE Energy Products – France

2006/2007.
Installation works of n. 4 (four) PG61111 FA Gas Turbine and Generator Unit and auxiliaries systems for ISAB North Impianti / ERG in Priolo Gargallo (SR – Italy).

 

ASTER Termoimpianti S.p.A.

2006/2007.
Installation of n. 2 desalination plant  (equipments, piping, etc… ) for the new EDISON Power Station in Simeri Crichi (CZ – Italy).

 

TOSHIBA International Europe Ltd.

2006/2007.
Complete erection of n. 1 Stem Turbine & Generator 300 MW for the new EDISON Power Station in Simeri Crichi (CZ – Italy).

 

EDISON S.p.A.

2006/2007.
Prefabrication, erection and supervision for mechanical BOP installation for the new EDISON Power Station in Simeri Crichi (CZ – Italy).

 

GENERAL ELECTRIC Int. Ltd.

2006/2007.
Erection of n. 2 Gas Turbine mod. Fr. 9FB, Generator, piping and ancillary system for new EDISON Power Station in Simeri Crichi (CZ – Italy).

 

ELEX AG

2006.
Erection of Denox plant for new cement production plant in Monselice (PD – Italy).

 

EDISON S.p.A.

2005.
Supply, prefabrication, erection and dismantling of pipe lines for HRSG blowing for the new EDISON Power Station in Torviscosa (UD – Italy). Supervision for installation of P91 critical pipe lines.

 

SIEMENS-AG Power Generation

2005/2007.
Complete erection of n. 3 Gas Turbine, n. 2 Steam Turbine and ancillary equipments for the RAS LAFFAN Power Station (QATAR).

 

AIR PRODUCTS PLC.

2005.
Erection of BOP System for the RAS LAFFAN Power Station (QATAR).

 

TOSHIBA International Europe Ltd

2005/2006.
Complete erection of n. 1 Stem Turbine & Generator 285 MW for the new EDISON Power Station in Torviscosa (UD – Italy).

 

TECNIMONT S.p.A.

2004.
Prefabrication and erection of a large branch of the mechanical Balance of Plant for the new EDISON Power Station in Altomonte (CS – Italy).

 

ALSTOM Power Italia S.p.A.

2004/2005.
Partial erection of. n. 2 HRSG for the new EDISON Power Station (800 MWe) in Altomonte (CS – Italy).

 

SIEMENS-AG Power Generation

2004/2005.
Erection of no. 1 GT and no. 1 ST, on a single shaft,  and generator for the BASF Power Plant Site in Antwerp (BELGIUM).

 

ALSTOM Power Italia S.p.A.

2004/2005.
Complete erection of. n. 2 HRSG for the new EDISON Power Station (800 MWe) in Torviscosa (UD – Italy).

 

TOSHIBA International Europe Ltd.

2004/2005.
Complete erection of n. 1 Stem Turbine 135 MW for the new EDISON Power Station in Candela (FG – Italy).

 

GEA Btt

2004/2005.
Erection of n. 2 complete Air Cooled Condenser for the RAS LAFFAN Power Station (QATAR).

 

COLACEM S.p.A

2004.
Replace of outlet kiln transition piece, replace of no. 4 bearing on bases 1&2 on Caravate (VA – Italy) plant.

 

TOSHIBA International Europe Ltd.

2004/2005.
Complete erection of n. 1 Stem Turbine 285 MW for the new EDISON Power Station in Altomonte (CS – Italy).

 

FIATENGINEERING S.p.A.

2004/2005.
Prefabrication and erection of a large branch of the mechanical Balance of Plant for the new EDISON Power Station in Altomonte (CS – Italy).

 

GEA Energietechnik GmbH

2004/2005.
Erection of a complete Air Cooled Condenser for the new EDISON Power Station in Altomonte (CS – Italy).

 

PROTECMA S.r.l.

2003/2004.
Construction and erection of the BOP for the combined cycle and erection of n. 1 steam turbine Franco TOSI for the AGAC S.p.A. Power Station in Reggio Emilia.

 

GEPEE

2003.
Erection of n. 2 gas turbine and generator General Eletric 6000 Bev for the ROQUETTE ITALIA S.p.A. Power Station in Cassano Spinola (AL – Italy) and  the AGAC S.p.A. Power Station in REGGIO EMILIA .

 

KARRENA ITALIA S.p.A.

2003.
Construction and erection of a chimney stack (125 metres high – ø6.400) for the EDIPOWER Power Station in Sermide (MN – Italy).

 

ENELPOWER S.p.A.

2003/2004.
Design, construction and erection of a triple chimney stack (130 metres high – ø6000) and their supporting structures and exhaust gas ducts for the ENDESA Power Station in Lodi (MI – Italy).

 

ENELPOWER S.p.A.

2003.
Erection of n. 1 gas turbine and generator General Eletric 9000E for the ASM Power Station in Ponti Sul Mincio (MN – Italy).

 

ENELPOWER S.p.A.

2003.
Construction and erection of pipe rack, auxiliary building and other metallic carpentry for the re-powering of EDIPOWER Power Station in Sermide (MN – Italy).

 

ENELPOWER S.p.A.

2003.
Design, construction and erection of three exhaust gas duct (corten) for the re-powering of the EDIPOWER Power Station in Sermide (MN – Italy).

 

ENELPOWER S.p.A.

2002/2003.
Design, construction and erection of 24” fuel gas pipe line in RAS LAFFAN industrial City (QATAR).

 

ENELPOWER S.p.A.

2002/2003.
Complete erection of a Siemens gas turbine and generator to ENEL plant in Pietrafitta (PG – Italy).

 

SACCI S.p.A.

2003/2004.
Construction and erection of the new gas ducts with steel structures for kiln modification to Cagnano Amiterno (AQ – Italy).

 

COLACEM S.p.A

2003/2004.
Construction and erection of the new cement mill plant in Sesto Campano (IS – Italy).

 

EDILCENTRONORD S.r.l.

2003.
Execution of mechanical and technologic works to the new FISCHER’s factory in Pianella (PE – Italy).

 

ENELPOWER S.p.A.

2001/2003.
Mechanical erection of a complete new turbogas power station in Ballylumford (NORTH IRELAND).